Alemany-USA
Company
Home
Services
Building Automation Systems-TALON
Smoke Control Systems
Fire Alarm Systems
Products
SIEMENS Industry
Sign In
My Account
Alemany, LLC
Alemany-USA
Company
Home
Services
Building Automation Systems-TALON
Smoke Control Systems
Fire Alarm Systems
Products
SIEMENS Industry
Sign In
My Account
Preventive Maintenance
Preventive Maintenance Checklist
Date
*
MM
DD
YYYY
Customer name
*
Address
*
Address 1
Address 2
City
State/Province
Zip/Postal Code
Country
Overall visual inspection: Complete overall visual inspection to be sure all equipment is operating and that safety systems are in place.
*
Verify control schedules: Verify in control software that schedules are accurate for season and occupancy.
*
Verify setpoints: Verify in control software that setpoints are accurate for season and occupancy.
*
Time clocks: Reset after every power outage.
*
Check all gauges to make sure readings are as expected.
*
Control tubing (pneumatic System) Check for proper control and cleanliness.
*
Check outside air volumes proper function.
*
Check Setpoints: Temperatures should not exceed or drop below design limits.
*
Check Schedules: Verify the bottom, surface and water column blow downs are occurring and are effective.
*
Check deadbands: Assure that all deadbands are accurate and that the only simultaneous heating and cooling is by design.
*
Check Sensors: Conduct thorough check of all sensors for temperature, pressure, humidity and flow for expected values.
*
Time clocks: Check for accuracy and clean.
*
Backup programs
*
Calibrate all sensors for temperature, pressure, humidity and flow. (Critical sensors should be calibrated seasonally or more often. Critical sensors include Outside Air Sensors, discharge air sensors on large systems, or other sensors that have a large influence on multiple control sequences.)
*
Technician performing the assessment
First Name
Last Name
Thank you!